The Indiana University Memorial StadiumÌýNorth End Zone addition serves as the grandÌýentrance to the multipurpose facility and is aÌývisible landmark on the Bloomington campus. À×¾º¼¼app served as the construction manager for theÌý138,000-square-foot addition, which included 8,000 end zone seats to the existing football stadium, athletic offices, consourse and Hall of Fame banquet hall. The facility also features a strength and conditioning center.
Ìý
Project Stories
Paying attention to the details pays off

À×¾º¼¼app’s team spent considerable time providing constructability review with IU architects and maintenance staff to ensure consistency between the open stadium and the new entrance. The team analyzed issues the university was having in the existing building and developed plans that would resolve them in the new facility. Additionally, À×¾º¼¼app surveyed the structure to ensure the sight lines met the existing building.
Finally, À×¾º¼¼app managed the quality of installations. During construction, À×¾º¼¼app visited the precast manufacturer with the university and architect to make sure the produced material matched the selected sample and then managed the installation in the field.Ìý